It is a study to evaluate and identify the predictable environmental consequences and the best combination of economic and environmental costs and benefits of the proposed project. On the basis of EIA, an Environmental Management Plan (EMP) is prepared, which is a description of the means by which the environmental consequences as pointed out in the EIA will be mitigated. Together the whole draft is termed as EIA-EMP report.

Why EIA is conducted:

  1. To systematically examine both beneficial and adverse consequences of the proposal.
  2. To ensure that those consequences are taken into account during project design.
  3. To identify possible environmental effects of the proposal and means to mitigate them.
  4. To predict whether there will be significant adverse effects even after the mitigation.
  5. To lessen conflicts by promoting community participation and informing decision makers.

 

MPSC Notes brings Prelims and Mains programs for MPSC Prelims and MPSC Mains Exam preparation. Various Programs initiated by MPSC Notes are as follows:- For any doubt, Just leave us a Chat or Fill us a querry––

Leave a Comment

Hope we have satisfied your need for MPSC Prelims and Mains Preparation

Kindly review us to serve even better


MPSC Mains Test Series 2019

20 Quality mock tests and GS Mains Notes

Mains Test Series and Notes

Mains Printed Notes (With COD)


MPSC Prelims Test Series 2019

24 Quality mock tests and GS Prelims Notes

Prelims Test Series and Notes

Prelims Printed Notes (With COD)

[jetpack_subscription_form title=”Subscribe to MPSC Notes” subscribe_text=”Never Miss any MPSC important update!” subscribe_button=”Sign Me Up” show_subscribers_total=”1″]